Differences between revisions 2 and 3
Size: 706
Comment:
|
Size: 731
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
''This is work in progress'' | == This is work in progress == |
Line 5: | Line 5: |
''Requirements:'' | <<TableOfContents>> = Requirements: = |
Summary of Requirements to make a Ninux.org node
This is work in progress
Contents
Requirements:
- A Site where to install the node
- Possibly this place needs to be reachable from the apartment/house in order to run the cable(s) to it
- Look for an available antenna pole to use, or mounting place
An Access Point
- Flash it with the appropriate Firmware (links?)
Perhaps prepare an appropriate housing to protect is against rain and weather